• 午夜影院在线观看,午夜精品网站在线观看,欧美午夜视频,国产精品午夜成人免费APP

    Welcome to济南济柴午夜影院在线观看燃气发电设备有限公司official website!

    Contact information

    Tel:
    +86-531-88012499
    Mob:
    +86-18668968402
    +86-18678860619
    Fax:
    +86-531-69958299
    Email:
    greenpowercn@126.com
    Address:
    Building 8, Shuntai Square, Shunhua Road,High-tech Zone, Jinan City, PRC

    Gas power generation project

    Shanxi 15MW coal mine gas power generation project

    Create a project and build a monument

    Case Introduction
    • List the emergency plan of hidden dangers and dangerous points, establish the registration system of
    • 总体情况介绍:

      山西15

      List the emergency plan of hidden dangers and dangerous points, establish the registration system of entering the power station, and improve the assessment system of the power station. (Emergency plan and system have been established and perfected)

      The sign on the pipe between the gas pump house and the power station is not clear. (Re-customized sign and posted)

      Gas generator adopts 400V low voltage grid-connected, need to develop special measures to standardize grid-connected operation. (Developed and made for wall hanging)

      If the problem involves the manufacturer, the installer will reflect it to the manufacturer and come up with specific handling suggestions. (The problem has been copied and reported to the manufacturer)

      The smoke exhaust pipe has no insulation measures, and the explosioning device is located in the generator room. Isolation measures and warning signs should be taken outside the room. (Flue heat insulation measures have been completed, explosive-discharge device has been contacted by the manufacturer must be issued by the manufacturer and implemented)

      The gas power station shall be included in the scope of safety production inspection of the Shuileng mine, and the Shuileng mine shall carry out safety inspection and evalsuation on a regular basis, and the inspection contents shall be reported to the power supply Department and the Safety supervision Bureau.

    Jinan Jichai Huanneng Gas Power Generation Equipment Co., Ltd
    • 服务热线

      0531-62325028
      0531-69951266

    Shanxi 15MW coal mine gas power generation project

    Do a project, build a monument

    List the emergency plan of hidden dangers and dangerous points, establish the registration system of

    山西15

    List the emergency plan of hidden dangers and dangerous points, establish the registration system of entering the power station, and improve the assessment system of the power station. (Emergency plan and system have been established and perfected)

    The sign on the pipe between the gas pump house and the power station is not clear. (Re-customized sign and posted)

    Gas generator adopts 400V low voltage grid-connected, need to develop special measures to standardize grid-connected operation. (Developed and made for wall hanging)

    If the problem involves the manufacturer, the installer will reflect it to the manufacturer and come up with specific handling suggestions. (The problem has been copied and reported to the manufacturer)

    The smoke exhaust pipe has no insulation measures, and the explosioning device is located in the generator room. Isolation measures and warning signs should be taken outside the room. (Flue heat insulation measures have been completed, explosive-discharge device has been contacted by the manufacturer must be issued by the manufacturer and implemented)

    The gas power station shall be included in the scope of safety production inspection of the Shuileng mine, and the Shuileng mine shall carry out safety inspection and evalsuation on a regular basis, and the inspection contents shall be reported to the power supply Department and the Safety supervision Bureau.

    Next:山西20×500
    网站地图